显示标签为“shuttle”的博文。显示所有博文
显示标签为“shuttle”的博文。显示所有博文

2011年5月2日星期一

Electrical Problems Force Delay in Shuttle Launching

Less than four hours before the scheduled 3:47 p.m. liftoff, National Aeronautics and Space Administration officials announced that it would be delayed at least until Monday afternoon while technicians tried to fix the problem, which affects equipment that supplies hydraulic power to move the shuttle’s engines and flaps during ascent and re-entry.


Officials suggested that the launching could be delayed further. “We will not fly this machine until it is ready,” said Michael D. Leinbach, the shuttle launching director, “and today it was not ready to go.”


The delay frustrated huge crowds that had gathered outside the space center to watch the start of the next-to-last mission in the 30-year shuttle program.


Mr. Obama, who had been scheduled to watch the launching with his wife, Michelle, and daughters, was touring tornado damage in Alabama when the postponement was announced. He decided to visit the space center anyway, arriving about two hours later.


At the launching control center, the president and his wife met for about 10 minutes with Gabrielle Giffords, the wounded Arizona Democratic congresswoman and wife of the mission commander, Capt. Mark E. Kelly.


Just before going in to see Ms. Giffords, Mr. Obama greeted Captain Kelly in a corridor. The men shook hands and embraced.


The Obamas also met with the five other members of the shuttle crew. With their daughters, they toured the building where the Atlantis spacecraft is being prepared for the 135th and final shuttle mission, in late June. They walked under the shuttle, getting a close look at its thermal tiles.


The astronauts are under quarantine rules before a launching and ordinarily their contact with others, even family members, is restricted, but NASA officials said flight doctors had cleared the Obamas to meet with the crew.


Ms. Giffords, who suffered a severe head wound in a shooting in January, had arrived on Wednesday to watch the launching. There was no immediate word as to whether she would stay in Florida or return to the Houston rehabilitation hospital where she has been recovering for the past two months.


The astronauts had undergone final medical checks and donned orange flight suits and were on their way to the launching pad in a van when the postponement was announced. The van made a U-turn and parked briefly at the control center before returning to the astronauts’ quarters.


Whenever it begins, the mission, to the International Space Station, is scheduled to last two weeks. The Endeavour crew will install a $2 billion particle-physics experiment, the Alpha Magnetic Spectrometer, at the space station, where it will search for evidence of the elusive “dark matter” that is thought to be ubiquitous in the universe. The shuttle will also deliver spare parts, and the crew will perform maintenance tasks outside the station in four spacewalks.


Until Friday, preparations for the mission had been relatively smooth, with weather the major concern. But postponements due to equipment problems are not uncommon, and NASA officials had previously said they would not forgo safety procedures just because the president was going to be there.


Mr. Leinbach said the problem that forced the postponement was most likely an electrical short in an area of the shuttle that would take time to reach. Shortly after the decision was announced, technicians drained the spacecraft’s huge external fuel tank, which had been filled with liquid hydrogen and oxygen fuel early Friday. The fuels must be removed before it is safe to work on the spacecraft.


Mr. Leinbach and other officials said that depending on the extent of the problem, a Monday launching might be possible.


NASA has a launching window each afternoon through Wednesday; after that the Endeavour might have to wait until May 9 or 10 to try again.


Helene Cooper contributed reporting.


 

2011年4月30日星期六

Electrical Problems Force Delay in Shuttle Launching

 

Less than four hours before the scheduled 3:47 p.m. liftoff, National Aeronautics and Space Administration officials announced that it would be delayed at least until Monday afternoon while technicians tried to fix the problem, which affects equipment that supplies hydraulic power to move the shuttle’s engines and flaps during ascent and re-entry.


Officials suggested that the launching could be delayed further. “We will not fly this machine until it is ready,” said Michael D. Leinbach, the shuttle launching director, “and today it was not ready to go.”


The delay frustrated huge crowds that had gathered outside the space center to watch the start of the next-to-last mission in the 30-year shuttle program.


Mr. Obama, who had been scheduled to watch the launching with his wife, Michelle, and daughters, was touring tornado damage in Alabama when the postponement was announced. He decided to visit the space center anyway, arriving about two hours later.


At the launching control center, the president and his wife met for about 10 minutes with Gabrielle Giffords, the wounded Arizona Democratic congresswoman and wife of the mission commander, Capt. Mark E. Kelly.


Just before going in to see Ms. Giffords, Mr. Obama greeted Captain Kelly in a corridor. The men shook hands and embraced.


The Obamas also met with the five other members of the shuttle crew. With their daughters, they toured the building where the Atlantis spacecraft is being prepared for the 135th and final shuttle mission, in late June. They walked under the shuttle, getting a close look at its thermal tiles.


The astronauts are under quarantine rules before a launching and ordinarily their contact with others, even family members, is restricted, but NASA officials said flight doctors had cleared the Obamas to meet with the crew.


Ms. Giffords, who suffered a severe head wound in a shooting in January, had arrived on Wednesday to watch the launching. There was no immediate word as to whether she would stay in Florida or return to the Houston rehabilitation hospital where she has been recovering for the past two months.


The astronauts had undergone final medical checks and donned orange flight suits and were on their way to the launching pad in a van when the postponement was announced. The van made a U-turn and parked briefly at the control center before returning to the astronauts’ quarters.


Whenever it begins, the mission, to the International Space Station, is scheduled to last two weeks. The Endeavour crew will install a $2 billion particle-physics experiment, the Alpha Magnetic Spectrometer, at the space station, where it will search for evidence of the elusive “dark matter” that is thought to be ubiquitous in the universe. The shuttle will also deliver spare parts, and the crew will perform maintenance tasks outside the station in four spacewalks.


Until Friday, preparations for the mission had been relatively smooth, with weather the major concern. But postponements due to equipment problems are not uncommon, and NASA officials had previously said they would not forgo safety procedures just because the president was going to be there.


Mr. Leinbach said the problem that forced the postponement was most likely an electrical short in an area of the shuttle that would take time to reach. Shortly after the decision was announced, technicians drained the spacecraft’s huge external fuel tank, which had been filled with liquid hydrogen and oxygen fuel early Friday. The fuels must be removed before it is safe to work on the spacecraft.


Mr. Leinbach and other officials said that depending on the extent of the problem, a Monday launching might be possible.


NASA has a launching window each afternoon through Wednesday; after that the Endeavour might have to wait until May 9 or 10 to try again.


Helene Cooper contributed reporting.


 

2011年4月13日星期三

Nasa announces US shuttle museums

 12 April 2011 Last updated at 14:33 ET Highlights from the first Nasa shuttle mission, launched 12 April 1981

Nasa is to send three retired space shuttles to museums in California, Florida and suburban Washington.


Discovery heads to the Air and Space Museum's Udvar-Hazy Center in Virginia, Atlantis to Florida's Kennedy Space Center, and Endeavour to the California Science Center in Los Angeles.


Also, the prototype Enterprise, which never flew in space, goes to the Intrepid museum in New York City.


Nasa administrator Charles Bolden said each shuttle had "stories to tell".


"Take good care of our vehicles," said Mr Bolden, a former astronaut who flew four times on the shuttle. "They have served you well."


Twenty-one institutions around the country sought the retired craft, but at a ceremony with shuttle staff in Cape Canaveral, Florida, Mr Bolden quipped Nasa had only four to go round.


Two shuttles did not survive the programme.


In January 1986, the Challenger disintegrated during launch, killing all seven crew aboard. The Columbia, the first shuttle ever to fly into space, was destroyed while approaching landing in 2003, also killing the seven crew members.


The announcement in Florida came on the 30th anniversary of the first space shuttle flight and on the 50th anniversary of Soviet cosmonaut Yuri Gagarin becoming the first human to orbit the earth.


The shuttle programme is nearing an end, with only two flights remaining.